- Home
- Contact Us
- Request a Quote
- Increase Permeate Production in a New or Existing RO System
BiTurbo High Recovery RO

FEDCO Design Services
Fill in the form below
- For High Brackish, SWRO and Ultra High-Pressure RO
- FEDCO will suggest a membrane array design optimal with FEDCO pumps and turbos.
- Minimum capacity: 75 m3/d per train.
- Current maximum Train Capacity: 25,000 m3/day